Industrial Hub
Turnkey Mechanical systems for manufacturing units and power plants.




Infrastructure
The company handles these on a turnkey or package basis, ensuring compliance with CEA standards, IS codes, and project specifications
Erection, Testing & Commissioning of PLC, SCADA, Electrical Panels, Cables, RTU’s at all WTP and CWR (PumpHouse) locations at Lagoan, Kachhnoda Kalan, Jakhlau, Dhorra and Kadesara & Mau, GoVs Water Supply SchemeSchemes in Lalitpur district, UP including Operation & Maintenance for 10 Years




Rural Water Supply Project for Villages in Azamgarh District is implemented, is a vital initiative aimed at enhancing the quality of life for the local population. This project includes the comprehensive planning, execution, and management of water supply systems that will ensure safe and reliable access to clean drinking water for all residents.
In addition, it encompasses operations and maintenance (O&M) for a duration of 10 years, which is critical for the sustainability and efficiency of the service provided. This significant undertaking is being executed in the state of Uttar Pradesh under the esteemed Jal Jeevan Mission, which strives to provide every rural household with functional tap water connections. By focusing on such crucial utilities, we are taking significant strides toward achieving improved health outcomes and economic development within these communities.






STPP works at udungudi
Erection, Testing & Commissioning of WTP equipment AND PIPING, pumps and manifolds locations at Lagoan, Kachnoda Kalan, Jakhlau, Dhorra and Kadesara & Mau, GoVs Water Supply Schemes in Lalitpur district, UP including Operation & Maintenance for 10 Years
Work Order for Erection, Alignment, Testing, Trial Run, Commissioning and PG Test of Electrical, Control and Instrumentation work on Turnkey basis for Raw Coal Transportation By Pipe Conveyor System From Hingula OCP To Hingula Washery And SILO Construction At Balaram Siding, at Mahanadi Coalfields Limited, Hingula, Orissa
We completed major projects like BTG engineering works for NTPL 2x 500 MW, 4X660 MW TPCIL , 4X660 MW NCCPPL , Amelia Coal Mines CHP and Udangudi Pipe Conveyor System. These projects were integral to enhancing our infrastructure and have significantly contributed to our overall efficiency and productivity. The success of these endeavors highlights our commitment to innovation and excellence in all that we undertake.


→
BTG engineering works for NTPL 2x 500 MW power project Under M/s Narmada Engineering.
Sea Water Piping Network, Fire Fighting and Detection system, HVAC, Cranes & Hoists, DE and DS System, Miscellaneous and Sump Pumps, Drinking Water Distribution works for all mega power generations
Unloading, Storage, Assembly/Fabrication, Erection, Testing & Commissioning & PG Test of all equipment's of 4000 TPH External Coal Handling Plant for 2X660 MW, NCC Power Projects Limited, Krishnapatnam, Nellore Dt. A.P
In large-scale supercritical thermal power plants 4X660 MW TPCIL , Krishnapatnam, AP units, we undertaken detailed engineering, supply, fabrication, erection, alignment, testing, commissioning, and handover of critical utility and safety systems.
Erection, Alignment, Testing, Trial Run, Commissioning and PG Test of Mechanical and Electrical, Control & Instrumentation erection work on Turnkey basis for 18.6Km Long Jetty Belt & Pipe Conveyor System, Ship unloader to JNT-1 (Plant End) turnkey basis for ITD-Tangedco Pipe Conveyor Project at Udangudi, Tiruchendur, Tamilnadu








Industrial Hub


Scope of work is Electrical and C&I Items E&C of CHP & AHP for 2x660MW Udangudi STPP as per Technical Specification


Supply, Erection, Testing & Commissioning of Solar Street Lights with pole 15W, Foundation and other civil works for the same at all WTP and CWR (PumpHouse) locations at Lagoan, Kachhnoda, Jakhlau, Dhorra and Kadesara & Mau Schemes


Erection, Alignment, Testing, Trial Run, Commissioning and PG Test of Mechanical, Electrical, Control & Instrumentation work for Phase-1 Job-2 on Turnkey basis for Coal Handling Plant at Amelia Coal Block of THDC at Singrauli Amelia Coal Mines in Singrauli, Madhya Pradesh.
Installation of Station transformers, UAT & Generator Transformers, HT & LT panels, Cable trays, Cable laying & Other Accessories etc. for 1X250 MW, MSPGCL, Parli Vaijnath under M/s PRV Constructions.
Works at 4X660 MW NCCPPL Thermal Power plant, Krishnapatnam, Andhra Pradesh


About RVM Projects
Delivering electro-mechanical excellence since 2014 with safety and quality at our core while consistently striving to innovate and push the boundaries of technology. Our commitment to superior craftsmanship and attention to detail has established us as leaders in the industry, providing reliable solutions tailored to meet the diverse needs of our clients.


18+
15
Trusted Experts
10+ Years
Contact
Reach out anytime for project inquiries or support.
Phone
rvmprojects18@gmail.com/
Info@rvmprojects1218.com
+91-8179953623